deckwalk
Construction · maintenance · inspections · refit

The whole job on its drawings.

From the first walk to the signed certificate: 360° walks, tasks, checklists and certificates in one place, each pinned to where it happened. Subcontractors join from an email. Every document can be checked.

How it works
deckwalk: a drawing with a walk on it — every position a point, a task pinned where it was raised

One place for every kind of job on site

From a one-off refit to the inspection you run every month: set a job up once, turn it into a template, and every next one starts ready — same tabs, task types, checklists and certificates.

◧Construction

Drawings, site walks, punch lists and handover — every subcontractor on the same plan.

⟳Maintenance

Planned jobs with the same checklist every time; history per room, deck or piece of equipment.

☑Inspections

Checklists on the phone, a Fail becomes a task on its spot, a signed PDF anyone can check.

⚙Services

Service reports and test certificates in your company’s letterhead — filled on site, sent the same day.

⧉Retrofit & refit

Scan what is there, mark what changes, track every area as a sub-project until it is done.

Unique jobset it up your way
→
Templatetabs, task types, forms
→
Every next jobstarts ready in a click

How a job runs in Deckwalk

  1. 1Plan

    Upload the drawings or the 3D model, import a DXF — or let a LiDAR scan draw the plan.

    Drawings & 3D →
  2. 2See

    Walk the site with a 360° camera or a phone. Every frame lands on the drawing — compare any two dates.

    Walks →
  3. 3Act

    Raise tasks and fill checklists on the spot. Mention the subcontractor — they open it from the email.

    Tasks & forms →
  4. 4Prove

    Reports and certificates in your letterhead, each with a QR code anyone can check.

    Reports & certificates →
1 · Plan

Drawings and 3D the whole team opens — on site too.

Heavy 3D that opens fast — and drawings in one click

  • Any 3D file, converted onceUpload the model as it comes from design. It opens in seconds in the browser — on a tablet on site too.
  • Layers per disciplineHull, piping, cable, equipment: switch them on and off, X-ray through the rest.
  • Cut it openA section box, a view cube and saved views the whole team shares.
  • A drawing from any sideSave the top or any face of the box as a plan to scale — lines or shaded — and pin tasks and walks on it straight away. No drafting.
  • SnapshotsGrab the view you are looking at and drop it into a task or a report.
2 · See

The site as it is, on every date, pinned to the drawing.

Everything on the project, pinned to where it is

Walks on the drawing

Every 360° frame lands on the plan with position and heading. Step through it like street view, or jump to any spot.

Same spot, any date

Open the same place from another walk side by side, or hold the frame against the 3D model from the same pose.

Tasks with the conversation

Mark a defect, observation or RFI on the frame. Assign it, discuss it, attach site photos — it all stays on the task.

Measure and take off

Measure on the plan, in the scan or with the phone on site. Outline a room and get panels, foam and equipment as a BOM.

3 · Act

Tasks, checklists and certificates — filled where the work is.

Mention the subcontractor. That’s the whole setup.

Type @ and their email. They get the task, the photo and its place on the plan straight away — and open it from the email. No accounts, no roles, no access to manage.

  • They see only what you shared with them
  • They reply, add photos and mark it done
  • Access ends when the task is closed
AR
Ana Ruiz · T-3 · Panel joint open
Can you foam and seal this before Friday?
@jorge@acme-panels.com
✓Jorge got this task by email — he can open it now, no sign-up.
JR
Jorge · 12 min later
Done Thursday. Photo attached.

Drop a sample. Get the form in seconds.

Checklists, punch lists, test certificates — drop the Excel, the PDF or a photo of the paper form you use today. AI turns it into a form your crew fills on the phone, and every filled form comes back as a clean PDF.

  • The leading AI models — bring your own key
  • Or your own model on your own server — nothing leaves your network
  • Or ours, included — nothing to set up
XLSX
Hot work checklist.xlsxdropped · 1 sheet · 14 rows
✦ 6 s
Hot work checklistSection 1 · Before work starts
Fire watch posted✓ Pass✗ FailN/A
Gas test done, O₂ 20.9 %✓ Pass✗ FailN/A
Combustibles removed 11 m✓ Pass✗ FailN/A
→ Task T-14 raised on the drawing
Signed · SupervisorL. García
4 · Prove

Documents your client can trust — and check.

A report in one click, not one evening.

The whole project or one drawing as a PDF: the numbers by status, type, company and overdue, the drawing with every task as a numbered pin, and each task with its photo and conversation — in your company’s letterhead.

  • Filter: all tasks, what is still open, what is done
  • Sub-projects roll up into the parent’s report
  • Every report carries a QR code to check it
Project reportMV Northern Star · refit · all tasks
42Tasks
11Open
29Done
2Overdue
12345
T-1Oil leak under the port generatoropen
T-2Panel joint open, water ingressin progress
T-4Handrail loose at the stairsdone
ACME
MARINE
Acme Marine ServicesHarbour Road 12 · VAT ES-B00000000
PRESSURE TEST CERTIFICATE
Scan to check
this document
✓
Genuine documentIssued by Acme Marine Services
Certificate
C-2024-051
Vessel
MV Northern Star
Signed off
13 Mar · L. García
Drop the PDF — exactly the one issued

Every certificate checkable. Fakes don’t pass.

Each report, checklist and certificate carries your company’s letterhead and a QR code. Whoever gets it — the client, the class surveyor, port state control — scans it with a phone camera and sees who issued it, when, and whether it is still the current version.

  • Edited copies are caught: drop the PDF and it tells you if anything was changed
  • A document revised after printing shows as “not the latest version”
  • Nothing to install to check — any phone camera

Set it up the way your projects work

No fixed workflow to fit into. You decide the tags, the templates and what happens when — and nest projects the way the job is really split.

Your tags

Name them, colour them, put them on tasks, photos and walks. Filter everything by them.

Hot workClass surveyWarranty+ your own

Your templates

Task types, checklists, report layouts and room specs. Build one once, reuse it on every project.

Defect · with severity + photo requiredWeekly QA report · PDF

Your behaviour

Simple rules: who is notified, when a task closes, what a new walk does.

When a task is marked done → ask the owner to confirmWhen a walk is ready → compare with the last one

Projects inside projects

A vessel, then its systems. A site, then its buildings. Sub-projects inherit the drawings above them.

MV Atlantic Trader12 drawings
Helideck · foam system+ 12 inherited
Accommodation refit+ 12 inherited
Pilot

One job, four weeks. We set it up with you.

For project managers, superintendents and QA/QC leads. We load your drawings, do the first walk with you and turn your checklists and certificates into forms. After four weeks: the job on its drawings, the tasks closed, the documents in your letterhead.